EO: 1.1 – 1.9 FUN 1 EO: 1.1 FUN 1 EO: 1.2 FUN 1 EO: 1.3 FUN 1 EO: 1.4 FUN 1 EO: 1.5 FUN 1 EO: 1.6 FUN 1 EO: 1.7 & 1.8 FUN 1 EO: 1.9 EO: 1.10 – 1.19 FUN 1 EO: 1.10 FUN 1 EO: 1.11 FUN 1 EO: 1.12 FUN 1 EO: 1.13 FUN 1 EO: 1.14 FUN 1 EO: 1.15 FUN 1 EO: 1.16 FUN 1 EO: 1.17 FUN 1 EO: 1.18 FUN 1 EO: 1.19 EO: 1.20- 1.30 FUN 1 EO: 1.20 FUN 1 EO: 1.21 & 1.22 FUN 1 EO: 1.23 & 1.24 FUN 1 EO: 1.25 FUN 1 EO: 1.26 FUN 1 EO: 1.27 FUN 1 EO: 1.28 FUN 1 EO: 1.29 & 1.30 EO: 1.31- 1.39 FUN 1 EO: 1.31 & 1.32 FUN 1 EO: 1.33 & 1.34 FUN 1 EO: 1.35 & 1.36 FUN 1 EO: 1.37 FUN 1 EO: 1.38 FUN 1 EO: 1.39 EO: 1.40- 1.49 FUN 1 EO: 1.40 FUN 1 EO: 1.41 FUN 1 EO: 1.42 FUN 1 EO: 1.43 FUN 1 EO: 1.44 FUN 1 EO: 1.45 & 1.46 FUN 1 EO: 1.47 FUN 1 EO: 1.48 FUN 1 EO: 1.49 EO: 1.50- 1.62 FUN 1 EO: 1.50 FUN 1 EO: 1.51 FUN 1 EO: 1.52 FUN 1 EO: 1.53 FUN 1 EO: 1.54 FUN 1 EO: 1.55 FUN 1 EO: 1.56 FUN 1 EO: 1.57 FUN 1 EO: 1.58 FUN 1 EO: 1.59 FUN 1 EO: 1.60 FUN 1 EO: 1.61 FUN 1 EO: 1.62 Menu EO: 1.1 – 1.9 FUN 1 EO: 1.1 FUN 1 EO: 1.2 FUN 1 EO: 1.3 FUN 1 EO: 1.4 FUN 1 EO: 1.5 FUN 1 EO: 1.6 FUN 1 EO: 1.7 & 1.8 FUN 1 EO: 1.9 EO: 1.10 – 1.19 FUN 1 EO: 1.10 FUN 1 EO: 1.11 FUN 1 EO: 1.12 FUN 1 EO: 1.13 FUN 1 EO: 1.14 FUN 1 EO: 1.15 FUN 1 EO: 1.16 FUN 1 EO: 1.17 FUN 1 EO: 1.18 FUN 1 EO: 1.19 EO: 1.20- 1.30 FUN 1 EO: 1.20 FUN 1 EO: 1.21 & 1.22 FUN 1 EO: 1.23 & 1.24 FUN 1 EO: 1.25 FUN 1 EO: 1.26 FUN 1 EO: 1.27 FUN 1 EO: 1.28 FUN 1 EO: 1.29 & 1.30 EO: 1.31- 1.39 FUN 1 EO: 1.31 & 1.32 FUN 1 EO: 1.33 & 1.34 FUN 1 EO: 1.35 & 1.36 FUN 1 EO: 1.37 FUN 1 EO: 1.38 FUN 1 EO: 1.39 EO: 1.40- 1.49 FUN 1 EO: 1.40 FUN 1 EO: 1.41 FUN 1 EO: 1.42 FUN 1 EO: 1.43 FUN 1 EO: 1.44 FUN 1 EO: 1.45 & 1.46 FUN 1 EO: 1.47 FUN 1 EO: 1.48 FUN 1 EO: 1.49 EO: 1.50- 1.62 FUN 1 EO: 1.50 FUN 1 EO: 1.51 FUN 1 EO: 1.52 FUN 1 EO: 1.53 FUN 1 EO: 1.54 FUN 1 EO: 1.55 FUN 1 EO: 1.56 FUN 1 EO: 1.57 FUN 1 EO: 1.58 FUN 1 EO: 1.59 FUN 1 EO: 1.60 FUN 1 EO: 1.61 FUN 1 EO: 1.62 EO: 1.1 – 1.9 FUN 1 EO: 1.1 FUN 1 EO: 1.2 FUN 1 EO: 1.3 FUN 1 EO: 1.4 FUN 1 EO: 1.5 FUN 1 EO: 1.6 FUN 1 EO: 1.7 & 1.8 FUN 1 EO: 1.9 EO: 1.10 – 1.19 FUN 1 EO: 1.10 FUN 1 EO: 1.11 FUN 1 EO: 1.12 FUN 1 EO: 1.13 FUN 1 EO: 1.14 FUN 1 EO: 1.15 FUN 1 EO: 1.16 FUN 1 EO: 1.17 FUN 1 EO: 1.18 FUN 1 EO: 1.19 EO: 1.20- 1.30 FUN 1 EO: 1.20 FUN 1 EO: 1.21 & 1.22 FUN 1 EO: 1.23 & 1.24 FUN 1 EO: 1.25 FUN 1 EO: 1.26 FUN 1 EO: 1.27 FUN 1 EO: 1.28 FUN 1 EO: 1.29 & 1.30 EO: 1.31- 1.39 FUN 1 EO: 1.31 & 1.32 FUN 1 EO: 1.33 & 1.34 FUN 1 EO: 1.35 & 1.36 FUN 1 EO: 1.37 FUN 1 EO: 1.38 FUN 1 EO: 1.39 EO: 1.40- 1.49 FUN 1 EO: 1.40 FUN 1 EO: 1.41 FUN 1 EO: 1.42 FUN 1 EO: 1.43 FUN 1 EO: 1.44 FUN 1 EO: 1.45 & 1.46 FUN 1 EO: 1.47 FUN 1 EO: 1.48 FUN 1 EO: 1.49 EO: 1.50- 1.62 FUN 1 EO: 1.50 FUN 1 EO: 1.51 FUN 1 EO: 1.52 FUN 1 EO: 1.53 FUN 1 EO: 1.54 FUN 1 EO: 1.55 FUN 1 EO: 1.56 FUN 1 EO: 1.57 FUN 1 EO: 1.58 FUN 1 EO: 1.59 FUN 1 EO: 1.60 FUN 1 EO: 1.61 FUN 1 EO: 1.62 Menu EO: 1.1 – 1.9 FUN 1 EO: 1.1 FUN 1 EO: 1.2 FUN 1 EO: 1.3 FUN 1 EO: 1.4 FUN 1 EO: 1.5 FUN 1 EO: 1.6 FUN 1 EO: 1.7 & 1.8 FUN 1 EO: 1.9 EO: 1.10 – 1.19 FUN 1 EO: 1.10 FUN 1 EO: 1.11 FUN 1 EO: 1.12 FUN 1 EO: 1.13 FUN 1 EO: 1.14 FUN 1 EO: 1.15 FUN 1 EO: 1.16 FUN 1 EO: 1.17 FUN 1 EO: 1.18 FUN 1 EO: 1.19 EO: 1.20- 1.30 FUN 1 EO: 1.20 FUN 1 EO: 1.21 & 1.22 FUN 1 EO: 1.23 & 1.24 FUN 1 EO: 1.25 FUN 1 EO: 1.26 FUN 1 EO: 1.27 FUN 1 EO: 1.28 FUN 1 EO: 1.29 & 1.30 EO: 1.31- 1.39 FUN 1 EO: 1.31 & 1.32 FUN 1 EO: 1.33 & 1.34 FUN 1 EO: 1.35 & 1.36 FUN 1 EO: 1.37 FUN 1 EO: 1.38 FUN 1 EO: 1.39 EO: 1.40- 1.49 FUN 1 EO: 1.40 FUN 1 EO: 1.41 FUN 1 EO: 1.42 FUN 1 EO: 1.43 FUN 1 EO: 1.44 FUN 1 EO: 1.45 & 1.46 FUN 1 EO: 1.47 FUN 1 EO: 1.48 FUN 1 EO: 1.49 EO: 1.50- 1.62 FUN 1 EO: 1.50 FUN 1 EO: 1.51 FUN 1 EO: 1.52 FUN 1 EO: 1.53 FUN 1 EO: 1.54 FUN 1 EO: 1.55 FUN 1 EO: 1.56 FUN 1 EO: 1.57 FUN 1 EO: 1.58 FUN 1 EO: 1.59 FUN 1 EO: 1.60 FUN 1 EO: 1.61 FUN 1 EO: 1.62 FUN 1 EO: 1.5 1 / 10 The Gaussian distribution is applied to counting applications where the mean success is expected to be greater than: 10 100 20 50 2 / 10 What is the term for the sample activity that produces a count rate statistically different from the background, accounting for efficiency? Maximum Detectable Activity (MDA) Median Detectable Activity (MDA) Mean Detectable Activity (MDA) Minimum Detectable Activity (MDA) 3 / 10 What percentage of the area under a Gaussian distribution curve falls within the data point located at the mean plus or minus one standard deviation (1 σ)? 0.9 0.682 0.954 0.5 4 / 10 What distribution describes the random decay of radioactive atoms, and tends to favor values less than the average? Binomial distribution Uniform distribution Poisson distribution Gaussian distribution 5 / 10 In practice, how is the error caused by background radiation mitigated in radioactivity measurements? The background count rate is determined separately and subtracted from the total activity The background radiation is amplified to cancel out its effect The background radiation is ignored as insignificant The gross count rate is multiplied by the background rate 6 / 10 In the context of radiation measurements, what does the standard deviation (σ) describe? The highest point, or center of the curve The average value of all the values in the data set The minimum detectable activity in the data set The spread of the distribution around the mean 7 / 10 If the system background in an automatic counting system exceeds 0.5 cpm alpha and 1 cpm beta-gamma, what action should be taken? The background levels should be ignored The system should be recalibrated The detector should be cleaned or replaced The sample should be replaced 8 / 10 What is the critical detection level (LC) in the context of radiation measurement? The response level at which the detector output can be considered "above background" The average level of radiation detected during a series of measurements The level of radiation required to activate the detector The highest level of radiation that can be detected 9 / 10 What is the purpose of the minimum detectable counting rate (MDCR) in radiation measurements? To identify the source of background radiation To measure the total radiation emitted by a sample To distinguish true activity from background to an acceptable confidence level To determine the standard deviation of the sample's activity 10 / 10 What are the two types of counting errors associated with radioactivity measurements? Type A (Major error) and Type B (Minor error) Type X (External error) and Type Y (Internal error) Type I (False positive) and Type II (False negative) Type R (Random error) and Type S (Systematic error) Your score is Share your results with your friends!! LinkedIn Facebook Twitter VKontakte Restart quiz PreviousFUN 1 EO: 1.5Next