EO: 1.1 – 1.9 FUN 1 EO: 1.1 FUN 1 EO: 1.2 FUN 1 EO: 1.3 FUN 1 EO: 1.4 FUN 1 EO: 1.5 FUN 1 EO: 1.6 FUN 1 EO: 1.7 & 1.8 FUN 1 EO: 1.9 EO: 1.10 – 1.19 FUN 1 EO: 1.10 FUN 1 EO: 1.11 FUN 1 EO: 1.12 FUN 1 EO: 1.13 FUN 1 EO: 1.14 FUN 1 EO: 1.15 FUN 1 EO: 1.16 FUN 1 EO: 1.17 FUN 1 EO: 1.18 FUN 1 EO: 1.19 EO: 1.20- 1.30 FUN 1 EO: 1.20 FUN 1 EO: 1.21 & 1.22 FUN 1 EO: 1.23 & 1.24 FUN 1 EO: 1.25 FUN 1 EO: 1.26 FUN 1 EO: 1.27 FUN 1 EO: 1.28 FUN 1 EO: 1.29 & 1.30 EO: 1.31- 1.39 FUN 1 EO: 1.31 & 1.32 FUN 1 EO: 1.33 & 1.34 FUN 1 EO: 1.35 & 1.36 FUN 1 EO: 1.37 FUN 1 EO: 1.38 FUN 1 EO: 1.39 EO: 1.40- 1.49 FUN 1 EO: 1.40 FUN 1 EO: 1.41 FUN 1 EO: 1.42 FUN 1 EO: 1.43 FUN 1 EO: 1.44 FUN 1 EO: 1.45 & 1.46 FUN 1 EO: 1.47 FUN 1 EO: 1.48 FUN 1 EO: 1.49 EO: 1.50- 1.62 FUN 1 EO: 1.50 FUN 1 EO: 1.51 FUN 1 EO: 1.52 FUN 1 EO: 1.53 FUN 1 EO: 1.54 FUN 1 EO: 1.55 FUN 1 EO: 1.56 FUN 1 EO: 1.57 FUN 1 EO: 1.58 FUN 1 EO: 1.59 FUN 1 EO: 1.60 FUN 1 EO: 1.61 FUN 1 EO: 1.62 Menu EO: 1.1 – 1.9 FUN 1 EO: 1.1 FUN 1 EO: 1.2 FUN 1 EO: 1.3 FUN 1 EO: 1.4 FUN 1 EO: 1.5 FUN 1 EO: 1.6 FUN 1 EO: 1.7 & 1.8 FUN 1 EO: 1.9 EO: 1.10 – 1.19 FUN 1 EO: 1.10 FUN 1 EO: 1.11 FUN 1 EO: 1.12 FUN 1 EO: 1.13 FUN 1 EO: 1.14 FUN 1 EO: 1.15 FUN 1 EO: 1.16 FUN 1 EO: 1.17 FUN 1 EO: 1.18 FUN 1 EO: 1.19 EO: 1.20- 1.30 FUN 1 EO: 1.20 FUN 1 EO: 1.21 & 1.22 FUN 1 EO: 1.23 & 1.24 FUN 1 EO: 1.25 FUN 1 EO: 1.26 FUN 1 EO: 1.27 FUN 1 EO: 1.28 FUN 1 EO: 1.29 & 1.30 EO: 1.31- 1.39 FUN 1 EO: 1.31 & 1.32 FUN 1 EO: 1.33 & 1.34 FUN 1 EO: 1.35 & 1.36 FUN 1 EO: 1.37 FUN 1 EO: 1.38 FUN 1 EO: 1.39 EO: 1.40- 1.49 FUN 1 EO: 1.40 FUN 1 EO: 1.41 FUN 1 EO: 1.42 FUN 1 EO: 1.43 FUN 1 EO: 1.44 FUN 1 EO: 1.45 & 1.46 FUN 1 EO: 1.47 FUN 1 EO: 1.48 FUN 1 EO: 1.49 EO: 1.50- 1.62 FUN 1 EO: 1.50 FUN 1 EO: 1.51 FUN 1 EO: 1.52 FUN 1 EO: 1.53 FUN 1 EO: 1.54 FUN 1 EO: 1.55 FUN 1 EO: 1.56 FUN 1 EO: 1.57 FUN 1 EO: 1.58 FUN 1 EO: 1.59 FUN 1 EO: 1.60 FUN 1 EO: 1.61 FUN 1 EO: 1.62 EO: 1.1 – 1.3 FUN 2 EO: 1.1 FUN 2 EO: 1.2 FUN 2 EO: 1.3 EO: 1.4a – 1.4d FUN 2 EO: 1.4-a FUN 2 EO: 1.4-b FUN 2 EO: 1.4-c FUN 2 EO: 1.4-d EO: 1.4e – 1.4h FUN 2 EO: 1.4-e FUN 2 EO: 1.4-f FUN 2 EO: 1.4-g FUN 2 EO: 1.4-h EO: 1.4i – 1.5 FUN 2 EO: 1.4-i FUN 2 EO: 1.4-j FUN 2 EO: 1.4-k FUN 2 EO: 1.4-l FUN 2 EO: 1.5 Menu EO: 1.1 – 1.3 FUN 2 EO: 1.1 FUN 2 EO: 1.2 FUN 2 EO: 1.3 EO: 1.4a – 1.4d FUN 2 EO: 1.4-a FUN 2 EO: 1.4-b FUN 2 EO: 1.4-c FUN 2 EO: 1.4-d EO: 1.4e – 1.4h FUN 2 EO: 1.4-e FUN 2 EO: 1.4-f FUN 2 EO: 1.4-g FUN 2 EO: 1.4-h EO: 1.4i – 1.5 FUN 2 EO: 1.4-i FUN 2 EO: 1.4-j FUN 2 EO: 1.4-k FUN 2 EO: 1.4-l FUN 2 EO: 1.5 FUN 2 EO: 1.4-b 1 / 10 How many steam generators and reactor coolant pumps does a two-loop Westinghouse plant possess? Two steam generators and three reactor coolant pumps Three steam generators and three reactor coolant pumps Three steam generators and two reactor coolant pumps Two steam generators and two reactor coolant pumps 2 / 10 Which part of the Reactor Vessel and Internals contains the fuel assemblies and the equipment to align and support the weight of the fuel assemblies? Upper guide structure Lower core support area Top head Core barrel 3 / 10 What is the primary function of the Reactor Coolant System (RCS)? To increase the temperature of the reactor core To cool the reactor core by transferring the heat generated in the core to the Steam Generators To contain all of the fission products To facilitate the movement of reactor coolant 4 / 10 Which component in the Reactor Coolant System ensures the water is kept from boiling? Steam Generator Reactor Coolant Pumps Pressurizer Reactor Vessel 5 / 10 The highest radiological concern during Fuel Moves is due to: Medium Radiation levels regardless of fuel positioning Potential for low contamination levels No radiological concerns during Fuel Moves High / Locked or Very High Radiation levels if fuel is brought too close to the surface of the water or if irradiated fuel is brought out of the water 6 / 10 In the context of the Reactor Coolant System, which component consists of the reactor vessel, the steam generators, the reactor coolant pumps, a pressurizer, and the connecting piping? Tertiary system Quaternary system Secondary system Primary system 7 / 10 During a Core offload and reload, what are the potential radiological concerns? Low dose rates, low contamination levels, no discrete radioactive particles High dose rates, high contamination levels, discrete radioactive particles or airborne No radiological concerns are associated with a Core offload and reload Medium dose rates, medium contamination levels, potential for airborne 8 / 10 What radiological concerns are associated with CEDM work? High Radiation Area and potential for high contamination levels No radiological concerns associated with CEDM work Medium Radiation Area and potential for medium contamination levels Low Radiation Area and potential for low contamination levels 9 / 10 What is the primary material the reactor vessel is constructed from? Carbon steel Aluminum Manganese molybdenum steel Stainless steel 10 / 10 Which system acts as the second barrier to prevent the release of fission products into the environment? Heat Transfer System Reactor Coolant System Fission Product Containment System Steam Generating System Your score is Share your results with your friends!! LinkedIn Facebook Twitter VKontakte Restart quiz PreviousFUN 2 EO: 1.4-bNext